Houghton & Ladstone Towers

Refurbishment of natural smoke ventilation systems within two residential blocks

Usage Office & Residential
Solution Natural Smoke Ventilation
Location United Kingdom

Project

The residential blocks required new natural smoke ventilation systems. D+H UK replaced the old systems with certified NSHEV windows, control panels and unique wiring.

System

D+H UK replaced existing windows, fixed windows and louvres with certified NSHEV windows on all floors of both blocks. D+H UK’s work also included the installation of controls and wiring.

Our new D+H ACB-Bus drives and CPS-M control system allows us to significantly reduce wiring costs and containment. We are able to provide a single cable for power and control to multiple zones. Each drive can be programmed accordingly for independent operation.

Click here for a PDF download

Used products

D+H SHEV control panel modular CPS-M1-S

CPS-M1-S
SHEV control panel
230 V AC / 50 Hz
24 V DC
To the product
D+H Kettingaandrijving CDC-0252-0500-1-ACB-R

CDC-0252-0500-1-ACB
Chain drive
24 V DC / 0.8 A
250 N
500 mm
To the product

Do you have questions?

Contact us!


D+H UK

Unit 10, Lawnhurst Trading Estate, Cheadle Heath, Stockport, Cheshire SK3 0SD

webenquiry@dh-partner.co.uk

01614914840