dxd drives, dome vent and a control panel

18-22 Haverstock Hill

Natural smoke ventilation staircase and corridor systems within multi-purpose new build

Usage Office & Residential
Solution Natural Smoke Ventilation
Construction year 2022
Location United Kingdom
Architect Piercy & Company
dxd drives, dome vent and a control panel

Project

18-22 Haverstock Hill is a new five storey building in Camden with ground floor retail space and four upper floors providing 29 apartments.

System

D+H UK provided a natural smoke ventilation system within the new building.

The communal staircase is ventilated at roof level via an NSHEV dome vent. This provides roof access when necessary, via a key-operated switch.

The corridor is ventilated via an internal smoke shaft, with inlet doors on each level (basement through to fifth floor). An NSHEV roof louvre sits at the head of the shaft.

Our CPS-M multizone-zone smoke ventilation control panel operates the system. RT 45 call point units are located on each floor.

In the event of a fire, the inlet door on the fire floor will open, along with the NSHEVs at the head of the shaft and staircase. All remaining shaft inlets will be locked in the closed position. This will draw the smoke up and out of the building, providing clear escape routes for residents and access for firefighters.

Click here for a PDF download

Used products

D+H SHEV control panel modular CPS-M1-S

CPS-M1-S
SHEV control panel
230 V AC / 50 Hz
24 V DC
To the product
D+H SHEV operation panel RT 45

RT 45
SHEV operation panel
18 … 28 V DC

Do you have questions?

Contact us!


D+H UK

Unit 10, Lawnhurst Trading Estate, Cheadle Heath, Stockport, Cheshire SK3 0SD

webenquiry@dh-partner.co.uk

01614914840